auto
 

1 (New York City Subway service)

From Metro Wiki

Smallwikipedialogo.png This page uses content from Wikipedia. The original article was at 1 (New York City Subway service). The list of authors can be seen in the page history. As with Metro Wiki, the text of Wikipedia is available under the GNU Free Documentation License.
For the former BMT services, see BMT 1.

The 1 Broadway–Seventh Avenue Local is a service of the New York City Subway. It is colored red on station signs and the NYC Subway map because it represents service provided on the IRT Broadway-Seventh Avenue Line, which it follows for its entire route. For more information on the line, including history, see that article. Trains of the 1 service run 24 hours per day, seven days per week.

The following lines are used by the 1 service:

Line Tracks When
IRT Broadway-Seventh Avenue Line from 242nd Street–Van Cortlandt Park to 225th Street–Marble Hilllocalalways
Broadway Bridgelocalalways
IRT Broadway-Seventh Avenue Line from 215th Street to Chambers Streetlocalalways
IRT Broadway-Seventh Avenue Line from Chambers Street to South FerryN/Aalways

Contents

[edit] Service history

 
1

BROADWAY
 
9

DYRE AVE
1
1967-1979 bullet
(in a circle)

The original line that opened on October 27, 1904 from 145th Street to City Hall, via Broadway, 42nd Street, Park Avenue South, and Lafayette Street. There was express service, which used switches at 96th Street, as well as local service.

On November 1, 1904, the line was extended to 157th Street.

On January 16, 1905, Fulton Street opened.

On June 12, 1905, Wall Street opened, followed by Bowling Green and South Ferry loop the next month.

On March 12, 1906, the IRT Broadway-Seventh Avenue Line is extended to 215th Street; followed by 225th Street on January 14, 1907, and finally, to 242nd Street on August 8, 1908.

On April 15, 1919, the Clark Street Tunnel to Borough Hall, Brooklyn is completed. West Side trains no longer crossed Manhattan on the 42nd Street segment, which became the IRT 42nd Street Shuttle.

In December, trains began operating to Atlantic Avenue, Brooklyn.

On August 23, 1920, trains began alternating between Flatbush Avenue and Utica Avenue.

Three months later, the line is extended to Junius Street. Shuttle service began between that station and Utica Avenue.

On January 3, 1921, non-rush service terminates at Atlantic Avenue. Shuttle service began operating from Borough Hall to Flatbush Avenue and Pennsylvania Avenue, but this ended a month later.

A year later, the entire IRT Eastern Parkway Line is completed. Single track shuttles operated between Pennsylvania Avenue and New Lots Avenue.

Beginning on April 9, 1923, express service ran from 242nd Street to Pennsylvania Avenue and from 215th Street to Flatbush Avenue.

On October 31, 1924, service ran to New Lots Avenue.

Beginning on December 1, 1924, rush hour trains alternated to Utica Avenue and Flatbush Avenue. Over the decades, the route switched back and forth between Utica Avenue, New Lots Avenue and Flatbush Avenue at different times, (from 1934–37, trains separated at Brooklyn Museum, with one half going to Flatbush Avenue, and the other to New Lots Avenue) until February 6, 1959, when all trains were locals to South Ferry only.

After September 11, 2001, 1 trains had to be rerouted since the IRT Broadway-Seventh Avenue Line ran directly under the World Trade Center and was heavily damaged in the collapse of the South Tower. It ran only between 242nd Street and 14th Street, running local north of and express south of 96th Street; the 9 and skip-stop service were suspended at this time. On September 19, after a few switching delays at 96th Street, service was changed. 1 trains made all local stops from 242nd Street to New Lots Avenue via the Clark Street Tunnel and IRT Eastern Parkway Line, to replace 3 service, which terminated at 14th Street. On September 15, 2002, 1 trains returned to South Ferry and the skip-stop service was restored.

[edit] Skip-stop service

The 1/9 skip-stop service was introduced on August 26, 1989 to meet demands for more frequent service. At first, almost every station between 242nd Street–Van Cortlandt Park in the Bronx and 137th Street–City College in Manhattan was skipped. However, as time passed, many skipped stations became more utilized and were no longer skipped. Popularity and use rose to where the skip-stop service saved little or no time at all. By 1995, 1 trains only skipped three stops while 9 trains only skipped four. In early 2005, it was announced that the skip-stop service would be discontinued, and the 9 train made its final run on May 27.

At the end of the 9, skip-stop service assigned the following stations to the 1 only:

  • 238th Street
  • 215th Street
  • Dyckman Street
  • 157th Street

and the following stations to the 9 only:

  • 225th Street–Marble Hill
  • 207th Street
  • 145th Street

[edit] Subway Service Information

service Stations Subway Transfers Connections
Bronx
Stops all times Van Cortlandt Park–242nd Street
Stops all times 238th Street
Stops all times 231st Street
Manhattan
Stops all times Marble Hill–225th Street Metro-North Railroad
Stops all times 215th Street
Stops all times 207th Street
Stops all times Dyckman Street
Stops all times 191st Street
Stops all times 181st Street
Stops all times 168th Street A C (1234)
Stops all times 157th Street
Stops all times 145th Street
Stops all times 137th Street–City College
Stops all times 125th Street
Stops all times 116th Street–Columbia University M60 (to LaGuardia Airport)
Stops all times Cathedral Parkway (110th Street) M60 (to LaGuardia Airport)
Stops all times 103rd Street
Stops all times 96th Street 2 3 (1234)
Stops all times 86th Street
Stops all times 79th Street
Stops all times 72nd Street 2 3 (1234)
Stops all times 66th Street–Lincoln Center
Stops all times 59th Street–Columbus Circle 2 (5) A B (123a) C (1234) D
Stops all times 50th Street
Stops all times Times Square–42nd Street 2 3 (1234) 7 <7> (1a2a3c) A C (1234) E N Q R (1234) S (1234) W (123a) Port Authority Bus Terminal
Stops all times 34th Street–Penn Station 2 3 (1234) LIRR, Amtrak, NJ Transit
Stops all times 28th Street
Stops all times 23rd Street
Stops all times 18th Street
Stops all times 14th Street 2 3 (1234) F L V (123) PATH
Stops all times Christopher Street–Sheridan Square
Stops all times Houston Street
Stops all times Canal Street
Stops all times Franklin Street
Stops all times Chambers Street 2 3 (1234)
Station closed Cortlandt Street
Stops all times Rector Street
Stops all times South Ferry Staten Island Ferry

[edit] External links

[edit] References


view  talk  edit
New York City Subway (official site)
Services V
Shuttles (S) 42nd StreetFranklin AvenueRockaway Park
Unused/defunct 8 9 10 11 12 13 H K P T U X YJFK Express
BMT: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Shuttles: 63rd StreetBowling GreenCulverGrand StreetOther
Under construction Second Avenue Subway7 Subway ExtensionFulton Street Transit Center
Divisions IRTBMTIND (Second System)
Lists Inter-division connectionsInter-division transfersLinesServicesStationsTerminalsYards
Miscellaneous AccessibilityChainingHistoryMetroCardNomenclatureRolling stock
Other NYC transit Rail: AirTrain JFKAmtrakLIRRMetro-NorthNJT (rail)PATHStaten Island Railway
Other: NJT (buses)NYCT busesRoosevelt Island Tramway