- System name: Chongqing Rail Transit
- Native name: 重庆轨道交通
- Operational Lines: 9
- Rapid transit lines: 6
- Monorail lines: 2
- operators
- Name: Chongqing Rail Transit Group Corp
Native name: 重庆市轨道交通(集团)
line: 0(loop line),1, 2, 3, 4, 5, 6, 9 and 10
Operational Lines[]
Color | Line | Terminals | Year Opened | Newest Extension | Length (km²) | Stations |
---|---|---|---|---|---|---|
Line 1 | Chaotianmen — Daxuecheng | 2011 | 2012 | 36.6 | 23 | |
Line 2 | Jiaochangkou — Xinshancun | 2005 | 2006 | 19.2 | 18 | |
Line 3 | Yudong — Jiangbei Airport | 2011 | 2012 | 55.5 | 39 | |
Line 6 | Wulidian — Yuelai/Beibei | 2012 | 2013 | 56.7 | 18 |
Map[]