Template:Short description Template:Use mdy dates Template:Infobox NYCS service
The J Nassau Street Local and Z Nassau Street Express[1] are two rapid transit services in the B Division of the New York City Subway. Their route emblems, or "bullets", are colored Template:NYCS const since they use the BMT Nassau Street Line in Lower Manhattan.[2]
The J operates at all times while the Z, operating as its rush-hour variant,[3] runs with six trips in each peak direction on weekdays; both services run through the entirety of the BMT Archer Avenue and Jamaica lines, via the Williamsburg Bridge, and the Nassau Street Line between Jamaica Center–Parsons/Archer in Jamaica, Queens, and Broad Street in Lower Manhattan. When the Z operates, the two services form a skip-stop pair between Sutphin Boulevard–JFK and Myrtle Avenue-Broadway. In addition during rush hours and middays in the peak direction, they run express in Brooklyn between Myrtle Avenue-Broadway and Marcy Avenue, bypassing three stations. At all other times, only the J operates, serving every station on its entire route.
The current J/Z descends from several routes, including the JJ/15 between Lower Manhattan and 168th Street in Queens; the KK between 57th Street/Sixth Avenue in Midtown Manhattan and 168th Street in Queens; the QJ between 168th Street in Queens and Brighton Beach in Brooklyn; and the 14 between Lower Manhattan and Canarsie–Rockaway Parkway in Brooklyn. The current skip-stop pattern was implemented in 1988.
History[]
Before the Chrystie Street Connection[]
The Jamaica Line – then known as the Broadway Elevated – was one of the original elevated lines in Brooklyn, completed in 1893 from Cypress Hills west to Broadway Ferry in Williamsburg.[4] It was then a two-track line, with a single local service between the two ends, and a second east of Gates Avenue, where the Lexington Avenue Elevated merged.[5] This second service later became the 12, and was eliminated on October 13, 1950, with the abandonment of the Lexington Avenue Elevated.[6]
The second major service on the Broadway Elevated ran between Canarsie and Williamsburg via the BMT Canarsie Line, started on July 30, 1906, when the Broadway and Canarsie tracks were connected at East New York.[7] As part of the Dual Contracts, an extension from Cypress Hills east to Jamaica was completed on July 3, 1918,[8] a third track was added west of East New York, and express trains began running on it in 1922.Template:Citation needed
The Brooklyn–Manhattan Transit Corporation numbered its services in 1924,Template:Citation needed and the Canarsie and Jamaica services became 14 and 15. Both ran express during rush hours in the peak direction west of East New York. Express trains would only stop at Myrtle Avenue, Essex Street and Canal Street, before making local stops afterwards. Additional 14 trains, between Eastern Parkway or Atlantic Avenue on the Canarsie Line and Manhattan provided rush-hour local service on Broadway.[9] When the 14th Street–Eastern Line and Canarsie Line were connected on July 14, 1928,[10] the old Canarsie Line service was renamed the Broadway (Brooklyn) Line, providing only weekday local service over the Broadway Elevated west of Eastern Parkway. The Atlantic Avenue trips remained, and rush-hour trains continued to serve Rockaway Parkway (Canarsie), though they did not use the Broadway express tracks.[11] The 14 was later cut back to only rush-hour service.Template:Citation needed
On the Manhattan end, the first extension was made on September 16, 1908, when the Williamsburg Bridge subway tracks opened.[12] Broadway and Canarsie trains were extended to the new Essex Street terminal, and further to Chambers Street when the line was extended on August 4, 1913.[13] When the BMT Nassau Street Line was completed on May 30, 1931, the 15 was extended to Broad Street,[14][15] and the 14 was truncated to Canal Street.[11]
Weekday midday 14 Broadway-Brooklyn Local and midday 15 Jamaica Express service was discontinued on June 26, 1952.[16] Some 14 trains began terminating at Crescent Street on the Jamaica Line in 1956.Template:Citation needed
Manhattan-bound rush hour skip-stop service between Jamaica and East New York was implemented on June 18, 1959, with trains leaving 168th Street on weekdays between 7 a.m. and 8:30 a.m.[17] Express 15 trains served "A" stations, while the morning 14 became the Jamaica Local, running between Jamaica and Canal Street, and stopped at stations marked "B".[18] Express 15 trains continued to run express between Eastern Parkway and Canal Street, making only stops at Myrtle Avenue, Essex Street, and Canal Street.[17] These stations were as follows:[19]
- All trains: 168th Street • Sutphin Boulevard • 75th Street–Elderts Lane • Eastern Parkway • Myrtle Avenue • Essex Street • Canal Street
- "A" stations: 168th Street • Sutphin Boulevard • 121st Street • 111th Street • Woodhaven Boulevard • 85th Street–Forest Parkway • Elderts Lane • Crescent Street • Cleveland Street • Eastern Parkway
- "B" stations: 168th Street • 160th Street • Sutphin Boulevard • Queens Boulevard • Metropolitan Avenue • 104th Street • Elderts Lane • Cypress Hills • Norwood Avenue • Van Siclen Avenue • Alabama Avenue • Eastern Parkway
Letters were assigned to most BMT services in the early 1960s. The BMT Jamaica services retained their numbers until November 1967. The 15 became the QJ[20] (express), and the 14 became the JJ.[21]
Chrystie Street Connection to 1977[]
Template:Stack
When the Chrystie Street Connection opened on November 26, 1967, many services were changed. The two local services – the JJ (non-rush hours) and KK (rush hours) – were combined as the JJ, but without any major routing changes. Thus non-rush hour JJ trains ran between Jamaica and Broad Street, while morning rush hour JJ trains ran to Canal Street, and afternoon rush hour JJ trains ran between Canal Street and Atlantic Avenue or Crescent Street. The rush-hour express J was combined with the weekday QT Brighton Local via tunnel to form the weekday QJ, running between Jamaica and Brighton Beach via the Jamaica Line (express during rush hours in the peak direction), BMT Nassau Street Line, Montague Street Tunnel, and BMT Brighton Line (local). Finally, the RJ was a special peak-direction rush-hour service, running local on the Jamaica Line in the AM, express in the PM, Nassau Street Line, Montague Street Tunnel, and BMT Fourth Avenue Line to 95th Street in Fort Hamilton. This service served two purposes: (1) early AM service from Jamaica prior to the first QJ trains got the equipment to 95th Street in Brooklyn in time for the AM rush, and obviated the need to have early service to Brighton Beach; and (2) in the evening, trains returned from 95th Street in Brooklyn to Jamaica, allowing the QJ to avoid having to run on the Brighton Line in the Manhattan direction post-rush hour.
The next change was made on July 1, 1968, when the Chrystie Street Connection tracks to the Williamsburg Bridge opened. The Jamaica Line portion of the rush-hour JJ was modified to become a new rush-hour KK, running between Jamaica (peak direction) or Eastern Parkway (both directions) and the new 57th Street station on the IND Sixth Avenue Line in Manhattan, providing rush hour service to that station, as the B was extended to 168th Street in Washington Heights during rush hours and could not serve 57th Street. The MM (depicted with a dark green bullet on R27 signage) had been proposed as a supplement to the KK as a local to 57th Street–Sixth Avenue, but was kept as the M and extended from Chambers Street to Broad Street. The RJ was eliminated, being cut north of Chambers Street and relabeled as an RR variant, and the off-hour JJ was relabeled QJ. At the same time, the existing skip-stop service was extended to afternoon Jamaica-bound trains, with those QJ trains running express outbound from Eastern Parkway and serving "A" stations to Jamaica, and those KK trains serving "B" stations. Less than two months later, on August 18, the QJ was extended to Coney Island–Stillwell Avenue.[22][23] and the D cut back to Brighton Beach during QJ operating hours in order to avoid switching delays at Brighton Beach. On July 14, 1969, afternoon skip-stop service on the KK and QJ was discontinued.[24]
On January 2, 1973, the QJ, which was the longest route in the transit system, was cut back to Broad Street and redesignated the J; and the M was extended to Coney Island in its place. At the same time, the KK was cut back to Eastern Parkway from 168th Street and renamed the K,[25][26] and both skip-stop patterns were carried out by alternate J trains.Template:Citation needed
The K was discontinued entirely on August 30, 1976,[27] eliminating the J skip-stop and express service east of Myrtle Avenue in the evening rush hour. Skip-stop service was retained toward Manhattan during the morning rush hour. One-way express service remained west of Myrtle Avenue, for the M was switched to the local tracks at that time.[28] On January 24, 1977, as part of a series of NYCTA service cuts to save $13 million, many subway lines began running shorter trains during middays. As part of the change, J trains began running with four cars between 9:15 a.m. and 1:15 p.m.[29]
The following table summarizes the changes that were made between 1959 and 1976.
Morning rush-hour local | J Train R143 Marcy Avenue | Afternoon rush-hour local | Afternoon rush-hour express | Other local | Other express | |
---|---|---|---|---|---|---|
1959–1967 | 14/KK 168th Street – Canal Street, "B" stops inbound | 15/J 168th Street – Broad Street, "A" stops inbound | 14/KK Crescent Street, Atlantic Avenue, or Rockaway Parkway – Canal Street | 15/J 168th Street – Broad Street | 15/JJ 168th Street – Broad Street | 10/M Metropolitan Avenue – Chambers Street, rush hour only (west of Myrtle Avenue) |
1967–1968 | JJ 168th Street – Canal Street, "B" stops inbound | QJ 168th Street – Brighton Beach, "A" stops inbound | JJ Crescent Street or Atlantic Avenue – Canal Street | QJ 168th Street – Brighton Beach | JJ 168th Street – Broad Street QJ 168th Street – Brighton Beach, middays and early evenings RJ 168th Street – Bay Ridge, rush hour non-peak direction only |
M Metropolitan Avenue – Chambers Street, rush hour only (west of Myrtle Avenue) |
1968–1974 | KK 168th Street – 57th Street, "B" stops inbound | QJ 168th Street – Brooklyn, "A" stops inbound | KK 168th Street – 57th Street, "B" stops outbound | QJ 168th Street – Brooklyn, "A" stops outbound | QJ 168th Street – Broad Street or Brooklyn | M Metropolitan Avenue – Chambers Street, rush hour and (from 1969) middays and early evenings (west of Myrtle Avenue) |
1974–1976 | K Eastern Parkway – 57th Street | J 168th Street – Broad Street, two inbound patterns, one for "A" stops and one for "B" stops | K Eastern Parkway – 57th Street | J 168th Street – Broad Street, two outbound patterns, one for "A" stops and one for "B" stops | J 168th Street – Broad Street | M Metropolitan Avenue – Coney Island, rush hour, middays and early evenings (west of Myrtle Avenue) |
1977 to present[]
Archer Avenue Line[]
The J was truncated to Queens Boulevard just after midnight on September 11, 1977,[30] and to 121st Street on April 15, 1985, as portions of the elevated Jamaica Line closed and were demolished. The Q49 shuttle bus replaced service at the closed stations until 1988.[31]
The BMT Archer Avenue Line opened on December 11, 1988, extending the line east from 121st Street to Jamaica Center–Parsons/Archer. The Z train first ran that day, introducing the present J/Z skip-stop pattern.[32] The new Z trains would go skip-stop between Jamaica Center and Broadway Junction (later extended to Myrtle Avenue) during rush hours, then making all J stops to Broad Street. Bus service on several Queens bus routes was rerouted to serve Jamaica Center instead of the 169th Street station several blocks away.[33] The J/Z skip-stop service was touted, in an attempt to relieve some crowding on the IND Queens Boulevard Line, as being faster to lower Manhattan than E, F, and R service. Because the MTA hoped that Queens passengers would transfer to the J/Z from the E, F, and R, every subway car on the J and ZTemplate:'s fleet was completely graffiti-free.[34]
One of the goals of the Archer Avenue project was to make Jamaica Line service as attractive as possible, and as a result, the TA planned to provide a form of express service. The two options considered to speed up Jamaica Line service were skip-stop service, which would have split Jamaica services into two patterns that served alternate stops, and a zone-express service, which would have split Jamaica services into a short-turn local service and a full-length express services. The zone-express option was dismissed in favor of the skip-stop option because its operation has to be very precisely timed so as to not hinder reliability, because service in the outer zone past the boundary of zone express service at Crescent Street or 111th Street would be too infrequent, and because many stations would lose half their service.[35]Template:Rp Outer-zone expresses, after Crescent Street would skip stops on the local track until Eastern Parkway, from where it would run on the express track, stopping at Myrtle Avenue before going straight to Essex Street in Manhattan, skipping Marcy Avenue.[36] Outer-zone expresses and inner-zone locals would have each been limited to frequencies of 10 minutes.[35]Template:Rp
The TA decided to implement skip-stop service with two services labeled "J" and "Z", with lightly-used stops designated as "J" or "Z" stops, and those with higher ridership being all-stop stations. The all-stop stations were Parsons Boulevard, Sutphin Boulevard, Woodhaven Boulevard, Crescent Street, Eastern Parkway, Myrtle Avenue, Marcy Avenue, and all stops in Manhattan except for Bowery, which was to be served by only the M train. Bowery's low ridership did not justify more than one service to stop at the station; the J stopped there evenings, nights and weekends when the M did not operate into Manhattan. The J-only stops while skip-stop was operating were 111th Street, Forest Parkway, Cypress Hills, Cleveland Street, Alabama Avenue, Halsey Street and Kosciusko Street. The Z-only stops were 121st Street, 102nd Street, Elderts Lane, Norwood Avenue, Van Siclen Avenue, Chauncey Street and Gates Avenue.[37] To further speed up service, J and Z trains would run express between Myrtle and Marcy.[35]Template:Rp Trains on the J/Z ran every five minutes, an improvement over their previous headway of eight minutes.[38] Skip-stop service ran to Manhattan in the morning between 7:15 and 8:15 a.m. and to Jamaica between 4:45 and 5:45 p.m.[39][40]
Midday express service was added with J service continuing to run express in the peak direction between Marcy and Myrtle. Surveys of ridership at local stops found that service could be adequately provided by midday M service.[35]Template:Rp The running time for skip-stop service from Parsons Boulevard to Broad Street was 48 minutes, compared to Template:Frac minutes for all-local service and 52 for the E. It was expected that 2,250 Queens Boulevard riders would switch to the J and Z.[35]Template:Rp To make J/Z service more attractive, all trains on those lines consisted of refurbished subway cars that were more quiet, graffiti-free, and had improved lighting and new floors. All cars on the J/Z were expected to have air-conditioning by summer 1989.[41]
Express service was not implemented between Broadway Junction and Myrtle Avenue because local service would have needed to be operated between those points in addition to the J and Z. The two terminals for such a service (57th Street and Broad Street) lacked spare capacity, although it was acknowledged that 57th Street on the IND Sixth Avenue Line could be used as a terminal once Manhattan Bridge subway-track repairs were completed.[35]Template:Rp
Queens Borough President Claire Schulman made multiple recommendations about revisions to the service plan for the extension at the MTA's February 1988 board meeting. She recommended that trains should use the express track between Myrtle Avenue and Eastern Parkway to reduce travel times, and that the Chrystie Street Connection be reused for service to the Jamaica Line.[42]
Post-1990 changes[]
On September 30, 1990, weekend J service was cut back to Canal Street,[43] but it was extended back to Chambers Street in January 1994.[44][45]
From May 1 to September 1, 1999, the Williamsburg Bridge was closed for reconstruction. J trains ran only between Jamaica Center–Parsons/Archer and Myrtle Avenue. J/Z skip-stop service operated in both directions between Jamaica Center and Eastern Parkway-Broadway Junction.[46][47][48] During the closure, B39 bus service over the Williamsburg Bridge was free.[49] The closure was anticipated to last until October 1999, but regular subway service was restored one month ahead of schedule.[50] The project cost $130 million, including replacing the tracks support structure, signal system and other equipment.[51] On September 1, 1999, J and Z trains, which previously skipped Bowery between 6 a.m. and 8 p.m. on weekdays, began stopping there at all times.[52]
After the September 11, 2001 attacks, service on the BMT Broadway Line in Lower Manhattan, as well as all R service, was suspended. J trains were extended beyond Broad Street via the Montague Street Tunnel to replace the R to Bay Ridge–95th Street at all times except late nights, when it only ran to Broad Street and a shuttle ran in Brooklyn between 95th and 36th Streets. J/Z skip-stop service was suspended.[53] Normal service on all three trains was restored on October 28.[54]
In May 2014, all trains began stopping at Alabama Avenue, presumably for the convenience of transit employees who work at the nearby East New York Yard and East New York Bus Depot.[55] In July 2014, the MTA proposed that weekend J service be extended from Chambers Street to Broad Street.[56] The service change went into effect on June 14, 2015.[57][58] From June 26, 2017 to April 27, 2018, J and Z trains ran local between Broadway Junction and Marcy Avenue at all times, supplementing the M, due to the BMT Myrtle Avenue Line connection being closed for reconstruction.[59][60][61]
In March 2020, skip-stop service was temporarily suspended due to lack of ridership and train crew availability caused by the COVID-19 pandemic.[62][63] Full service was restored in June 2020.[64][65] From December 29, 2021,[66][67] to January 19, 2022, skip-stop service was again suspended due to a shortage of crew members exacerbated by the COVID-19 pandemic.[68]
Template:Clear left
Route[]
Service pattern[]
The following table shows the lines used by the J and Z, with shaded boxes indicating the route at the specified times:
Line | From | To | Tracks | Times | ||||
---|---|---|---|---|---|---|---|---|
J service | Z service | |||||||
middays | evenings | weekends | rush peak | rush peak | ||||
BMT Archer Avenue Line | Jamaica Center | Sutphin Boulevard | all | |||||
BMT Jamaica Line | 121st Street | Myrtle Avenue | local (all) | |||||
local (skip-stop) | ||||||||
Myrtle Avenue | Marcy Avenue | local | ||||||
express | ||||||||
Williamsburg Bridge | all | |||||||
BMT Nassau Street Line | Essex Street | Broad Street |
Stations[]
For a more detailed station listing, see the articles on the lines listed above.[1]
Stations in green and stations in blue denote stops served by the J and Z, respectively, during rush hours in the peak direction. The J makes all stops at all other times.
Station service legend | |
---|---|
Stops all times | |
Stops all times except late nights | |
Stops late nights only | |
Stops weekdays only | |
Stops all times except rush hours in the peak direction | |
Stops rush hours in the peak direction only |
width=3% Template:CMain | width=3% Template:CGuest | Stations | Subway transfers | Connections/Notes | |
---|---|---|---|---|---|
Queens | |||||
Archer Avenue Line | |||||
align=center Template:CMain | align=center Template:CGuest | Jamaica Center–Parsons/Archer | E | Q44 Select Bus Service | |
align=center Template:CMain | align=center Template:CGuest | Sutphin Boulevard–Archer Avenue–JFK Airport Template:Rint | E | AirTrain JFK LIRR at Jamaica Q44 Select Bus Service | |
Jamaica Line | |||||
Stops all times except rush hours in the peak direction | align=center Template:CGuest | 121st Street | Q10 bus to JFK Int'l Airport | ||
align=center Template:CMain | 111th Street | ||||
Stops all times except rush hours in the peak direction | align=center Template:CGuest | 104th Street | |||
align=center Template:CMain | align=center Template:CGuest | Woodhaven Boulevard | Q52/Q53 Select Bus Service | ||
align=center Template:CMain | 85th Street–Forest Parkway | ||||
Stops all times except rush hours in the peak direction | align=center Template:CGuest | 75th Street–Elderts Lane | |||
Brooklyn | |||||
align=center Template:CMain | Cypress Hills | ||||
align=center Template:CMain | align=center Template:CGuest | Crescent Street | |||
Stops all times except rush hours in the peak direction | align=center Template:CGuest | Norwood Avenue | |||
align=center Template:CMain | Cleveland Street | ||||
Stops all times except rush hours in the peak direction | align=center Template:CGuest | Van Siclen Avenue | |||
align=center Template:CMain | align=center Template:CGuest | Alabama Avenue | |||
align=center Template:CMain | align=center Template:CGuest | Broadway Junction | A C | LIRR Atlantic Branch at East New York Some northbound a.m. rush hour trips begin/terminate at this stationTemplate:Efn Some southbound p.m. rush hour trips begin at this station | |
Stops all times except rush hours in the peak direction | align=center Template:CGuest | Chauncey Street | |||
align=center Template:CMain | Halsey Street | ||||
Stops all times except rush hours in the peak direction | align=center Template:CGuest | Gates Avenue | |||
align=center Template:CMain | Kosciuszko Street | B46 Select Bus Service | |||
align=center Template:CMain | align=center Template:CGuest | Myrtle Avenue–Broadway | Template:NYCS Jamaica Myrtle | ||
Stops all times except rush hours in the peak direction | Flushing Avenue | Template:NYCS Jamaica west local | B15 bus to JFK Int'l Airport | ||
Stops all times except rush hours in the peak direction | Lorimer Street | Template:NYCS Jamaica west local | |||
Stops all times except rush hours in the peak direction | Hewes Street | Template:NYCS Jamaica west local | |||
align=center Template:CMain | align=center Template:CGuest | Marcy Avenue | Template:NYCS Jamaica west local | B44 Select Bus Service Template:Ferry icon NYC Ferry: East River Route (at South Tenth Street west of Kent Avenue) | |
Manhattan | |||||
Nassau Street Line | |||||
align=center Template:CMain | align=center Template:CGuest | Essex Street | Template:NYCS Jamaica west local F (IND Sixth Avenue Line at Delancey Street) |
M14A Select Bus Service | |
align=center Template:CMain | align=center Template:CGuest | Bowery | |||
align=center Template:CMain | align=center Template:CGuest | Canal Street | File:Aiga elevator.svg | 4
6 <6>
(IRT Lexington Avenue Line) |
|
align=center Template:CMain | align=center Template:CGuest | Chambers Street | 4 5
6 <6> (IRT Lexington Avenue Line at Brooklyn Bridge–City Hall) |
||
align=center Template:CMain | align=center Template:CGuest | Fulton Street | 2 3 (1234) (IRT Broadway–Seventh Avenue Line) 4 5 |
Connection to N (5) R (1234) W (123a) (BMT Broadway Line) at Cortlandt Street via Dey Street Passageway | |
align=center Template:CMain | align=center Template:CGuest | Broad Street | M15 Select Bus Service Staten Island Ferry at Whitehall Terminal |
Notes[]
Template:Notelist
References[]
- ↑ 1.0 1.1 Template:NYCS const
- ↑ Line Colors. mta.info. Metropolitan Transportation Authority.
- ↑ SUB-DIVISION B TRAIN OPERATOR/CONDUCTOR ROAD & NON-ROAD WORK PROGRAMS IN EFFECT: NOVEMBER 6, 2016. New York City Transit (July 29, 2016).
- ↑ "Trains Running This Morning", Brooklyn Daily Eagle, May 30, 1893, p. 10.
- ↑ "Better Service on the Brooklyn L", Brooklyn Daily Eagle, December 20, 1893, p. 12.
- ↑ "Brooklyn 'El' Link Dies With Aplomb; Celebrants Pack Last Train to Run on Lexington Spur, Soon to Be Torn Down In Service For 65 Years Riders Were So Scarce That Its 8 Stations Were Closed at Night for Last 10 Years", The New York Times, October 14, 1950. (in en-US)
- ↑ "The BRT Opens Its New Extension for Through Traffic", July 31, 1906, p. 12.
- ↑ "New Subway Line", July 7, 1918, p. 30.
- ↑ Brooklyn–Manhattan Transit Corporation, Map and Guide to BMT Rapid Transit Division, 1924
- ↑ "Celebrate Opening of New B. M. T. Line", July 15, 1928, p. 13.
- ↑ 11.0 11.1 Brooklyn–Manhattan Transit Corporation, Map and Guide to BMT Rapid Transit Division, 1931
- ↑ "Mayor Runs a Train Over New Bridge", September 17, 1908, p. 16.
- ↑ "Bridge Loop to Open for One Line Only", August 3, 1913, p. 6.
- ↑ "Nassau St. Service Outlined by B.M.T.", May 21, 1931, p. 29.
- ↑ "Mayor Drives Train in New Subway Link", May 30, 1931, p. 11.
- ↑ Template:Cite journal
- ↑ 17.0 17.1 "Jamaica BMT to Start Speed-Up Tomorrow", June 17, 1959, p. 28.
- ↑ New York City Transit Authority, Official New York City Subway Map and Station Guide, 1959
- ↑ Skip Stop on the BMT Jamaica Line. New York City Transit Authority (1959).
- ↑ New York City Subway map, 1968 edition
- ↑ Joseph Cunningham and Leonard DeHart, A History of the New York City Subway System Part 2: Rapid Transit in Brooklyn, 1977
- ↑ New York City Transit Authority, Rapid Transit Service Changes, 1968
- ↑ KK A New Service. New York City Transit Authority (1968).
- ↑ Template:Cite journal
- ↑ "Subway Schedules In Queens Changing Amid Some Protest", January 2, 1973, p. 46.
- ↑ "Changes Set for Jan. 2 Praised", November 25, 1972.
- ↑ "Transit Agency Drops 215 Runs", August 31, 1976, p. 42.
- ↑ Service Adjustment on BMT and IND Lines Effective 1 A.M. Monday, Aug. 30. New York City Transit Authority (1976).
- ↑ Cosgrove, Vincent. "Straphangers: Mini-Train Idea Comes Up Short", New York Daily News, January 28, 1977.
- ↑ Dembart, Lee. "A Sentimental Journey on the BMT...", September 9, 1977, p. 61.
- ↑ Spring (April) 1985 Subway Map (en-us). New York City Transit Authority (April 1985).
- ↑ Johnson, Kirk. "Big Changes For Subways Are to Begin", December 9, 1988, p. B1.
- ↑ System-Wide Changes In Subway Service Effective Sunday, December 11, 1988. New York City Transit Authority (1988).
- ↑ Feinman, Mark S. (December 8, 2004). The New York Transit Authority in the 1980s.
- ↑ 35.0 35.1 35.2 35.3 35.4 35.5 (August 1988) Archer Avenue Corridor Transit Service Proposal. New York City Transit Authority, Operations Planning Department.
- ↑ Template:Cite journal
- ↑ (1988) J/Z map correction. New York City Transit Authority.
- ↑ "New Subway Line Finally Rolling Through Queens", Newsday, December 11, 1988, p. 7.
- ↑ (1988) Starting Sunday, December 11th, We'll Introduce The Greatest Number of Service Improvements Since 1904. New York City Transit Authority.
- ↑ (1988) Archer Avenue Extension Subway Service E F J R Z. New York City Transit Authority.
- ↑ Template:Cite journal
- ↑ Ain, Stuart. "Schulman hails plan for subway station", New York Daily News, February 29, 1988.
- ↑ Service Changes September 30, 1990. New York City Transit Authority (September 30, 1990).
- ↑ Glickman, Todd (October 6, 1998). Archive of NYC Subway Maps.
- ↑ January 1994 Subway Map (en-US). Metropolitan Transportation Authority (1993).
- ↑ No Trains Over The Williamsburg Bridge. Metropolitan Transportation Authority (1999).
- ↑ Williams, Monte. "Most Straphangers Unfazed By Closing of Bridge Lines", May 4, 1999.
- ↑ Rutenburg, James. "6-Month Bridgework To Disrupt J, M, Z Lines", New York Daily News, April 27, 1999.
- ↑ Williamsburg Bridge Map 1999 (en-us). New York City Transit (1999).
- ↑ NYC DOT - Williamsburg Bridge. New York City Department of Transportation.
- ↑ Donohue, Pete. "It's J -As In Joy- Train Riders Flying High On Fixed-Up W'Burg Span", New York Daily News, September 2, 1999.
- ↑ Rapid Transit Challenge.
- ↑ Soltren, Jose. September 19, 2001 Subway Map. nycsubway.org.
- ↑ Calcago, Michael. October 28, 2001 Subway Map. nycsubway.org.
- ↑ Compare:
- New York City Subway Map. Metropolitan Transportation Authority (February 2014). (Only the J served Alabama Avenue in February 2014)
- (The Z now also served Alabama Avenue in May 2014)
- ↑ Donohue, Pete. "MTA to upgrade weekend service on J train, restore it on LIRR's West Hempstead Branch", July 24, 2014.
- ↑ 2015 Service Enhancements. mta.info. Metropolitan Transportation Authority (2015).
- ↑ J/Z Subway Timetable: Now Available: Broad St Station service at all times (June 14, 2015).
- ↑ Rivoli, Dan. "M line to be shut down next year for repairs", March 17, 2016.
- ↑ Brown, Nicole. "MTA: M line will shut down for part of next year", March 18, 2016.
- ↑ Myrtle Avenue Line Infrastructure Projects. Metropolitan Transportation Authority.
- ↑ Guse, Clayton (March 24, 2020). Coronavirus forces MTA to implement big cuts to NYC's mass transit.
- ↑ Martinez, Jose. "Subway Service Slowly Gets Back On Track As Transit Workers Return", The City, April 28, 2020.
- ↑ Bascome, Erik (June 2, 2020). Full service on MTA buses, subways set to return by June 8.
- ↑ Siff, Andrew (June 5, 2020). MTA Resumes Regular Weekday Service; Overnight 4-Hour Closure Stays.
- ↑ COVID Staffing Crush Forces NYC Subway Suspensions, NJ Transit Cancellations (December 28, 2021).
- ↑ MTA subway lines suspended due to COVID staff shortages (December 30, 2021).
- ↑ 4 Major Subway Lines to Resume Regular Service as Omicron Staffing Havoc Ebbs (January 18, 2022).
External links[]
Template:Commons category multi
- MTA NYC Transit – J Nassau Street Express
- MTA NYC Transit – Z Nassau Street Express
- Template:NYCS const
- Template:NYCS const
- Template:NYCS const