- 0 Talk
-
Tokyo Subway
- System name: Tokyo Subway
- Native name: 東京の地下鉄
- Operational Lines: 13
- Lines Under Construction: 0
- operators
- Name: Tokyo Metro
Native name: 東京メトロ
line: Ginza, Marunouchi, Hibiya, Tōzai, Chiyoda, Yūrakuchō, Hanzōmon, Namboku, Fukutoshin - Name: Toei (Tokyo Metropolitan Bureau of Transportation)
Native name: 都営地下鉄
line: Asakusa, Mita, Shinjuku, Ōedo
- Note: Excluding Tokyo JR East, Tokyo Waterfront Odaiba Transit & Greater Tokyo Monorail
Map
Edit
Operational Lines
Edit
| Color | Line | Terminals | Year Opened | Newest Extension | Length (km²) | Stations |
|---|---|---|---|---|---|---|
| Asakusa Line (1/A) | Nishi-magome — Oshiage | 1960 | 1968 | 18.3 | 20 | |
| Hibiya Line (2/H) | Naka-Meguro — Kita-Senju | 1961 | — | 20.3 | 21 | |
| Ginza Line (3/G) | Shibuya — Asakusa | 1927 | 1997 | 14.3 | 19 | |
| Marunouchi Line (4/M) | Ogikubo — Ikebukuro/Hōnanchō | 1954 | 1996 | 27.4 | 32 | |
| Tōzai Line (5/T) | Nakano — Nishi-Funabashi | 1964 | 2000 | 30.8 | 23 | |
| Mita Line (6/I) | Meguro — Nishi-takashimadaira | 1968 | 2000 | 26.5 | 27 | |
| Namboku Line (7/N) | Meguro — Akabane-iwabuchi | 1991 | 2001 | 21.3 | 19 | |
| Yūrakuchō Line (8/Y) | Wakōshi — Shin-Kiba | 1974 | 1998 | 28.3 | 24 | |
| Chiyoda Line (9/C) | Yoyogi-uehara — Kita-Ayase | 1969 | 1979 | 24.0 | 20 | |
| Shinjuku Line (10/S) | Shinjuku — Moto-yawata | 1978 | 1989 | 23.5 | 21 | |
| Hanzōmon Line (11/Z) | Shibuya — Oshiage | 1978 | 2003 | 16.8 | 14 | |
| Ōedo Line (12/E) | Loop line beginning at Tochōmae | 2000 | — | 40.7 | 38 | |
| Fukutoshin Line (13/F) | Wakōshi — Shibuya | 2008 | — | 20.2 | 16 |

